Topic: | Stop the shaft protest march 15/3 6.15pm Battersea Arts Centre & new site - http://www.stoptheshaft.org/ | |
Posted by: | Louise de Silva | |
Date/Time: | 08/03/11 19:19:00 |
Pls note that these plans do not rule out Barn Elms and the Thames path and river. The plans put forward would mean that TW would drill one way rather than two which would reduce the spoil created by 60% so less lorries would be required. The amount of space needed for the construction would be reduced BUT the time it would take would still be 3 years, a large jetty is needed AND the ventilation shaft will still be needed. We need to remind them and The Mayor that this is a GREENFIELD Site and as such should be ruled out completely. Pls visit http://www.stoptheshaft.org/ for more info and join us on our protest march next Tues 15th March 6.15pm outside The Majors peoples Question time, Battersea Arts Center. We still need to keep fighting. STOPtheSHAFT - PUTNEY&BARNES |