Topic: | Re:Re:Re:Re:Re:Re:Re:Re:Re:Re:Re:Thames Tunnel | |
Posted by: | Sian Baxter | |
Date/Time: | 18/11/10 09:01:00 |
But the CSO site (ie. connection to the new super tunnel) doens't cause half the disruption as the main drive shaft site (from where the super tunnel is constructed!) in terms of duration, lorries, permanent structures etc. But to be factually correct even a CSO site doesn't have to be located here. They have said that they will only focus on the worst poluting CSO (and leave others). Has anyone seen any facts about how poluting the Putney/barnes one is compared to the many others along the river? |