Topic: | Re:Re:Re:Thames Tunnel | |
Posted by: | Janet Suckling | |
Date/Time: | 05/11/10 15:51:00 |
it would be two years to build the smaller CSO and seven years to build the main drive shaft which is what Thames Water want to do at Barn Elms close to Leaders Gdns |