Topic: | Re:Re:Re:Re:Re:Re:Re:Re:Re:Re:Re:Re:Re:Thames Tunnel - quid pro quo | |
Posted by: | Tim Wright | |
Date/Time: | 23/10/10 20:46:00 |
Turns out that Thames Water plans to "make" the massive concrete liners of the tunnel actually on site. That means that in addition to a vast mining operation on Barn Elms, there will also be a huge manufacturing works producing constant noise, dust and polution to the surrounding areas. For a minimum of seven years. |