Topic: | Re:Re:Re:Re:Re:Re:meeting with Justine Greening 5th Jan at 7.30pm | |
Posted by: | Roland Gilmore | |
Date/Time: | 05/01/11 13:48:00 |
Due to another commitment, I can't attend tonight. The questions I would like Justine to take up with TW are 1. Why TW are not planning to intercept the discharges from Mogden Sewage Treatment Works; it is these regular discharges that affect our stretch of the river the most. 2. What are the "whole of life" comparative costs of reducing the volumes of water requiring treatment by the seperation of foul from surface water in the West/South West area. The answer could result in a reduced size of relief sewer by moving the start point further East and a consequential reduction in costs. |