Topic: | Re:Reply | |
Posted by: | Ed Robinson | |
Date/Time: | 20/01/21 23:57:00 |
Michael - A bit more detail in the original press release below. I can't see how it could be used if the old bridge may collapse on it. They could have removed the old bridge months ago. It's all very odd! "The new truss structure would be assembled in two halves and launched from each side over the existing road surface. It will be supported on each bank and at the two existing piers. As a result, there will be no added load on the existing bridge deck. Elements of the Grade 2* listed bridge that need repair, including pedestals, anchors and chains, would be lifted away and transported by barges to an off-site facility for safe repair and restoration." https://www.fosterandpartners.com/news/archive/2020/11/foster-partners-reveals-plans-for-temporary-crossing-over-hammersmith-bridge/ |
Topic | Date Posted | Posted By |
Hammersmith Bridge | 13/01/21 23:07:00 | Barbara Stevens |
Re:Hammersmith Bridge | 14/01/21 10:02:00 | Katrina Black |
Re:Re:Hammersmith Bridge | 14/01/21 10:29:00 | Jonathan Callaway |
Reply | 14/01/21 12:46:00 | Michael Ixer |
Re:Reply for Barbara | 14/01/21 12:55:00 | Katrina Black |
Re:Re:Reply for Barbara | 14/01/21 13:14:00 | Jonathan Callaway |
Re:Re:Re:Reply for Barbara | 16/01/21 00:00:00 | Thomas Jones |
Re:Re:Re:Re:Reply for Barbara | 16/01/21 00:34:00 | Barbara Stevens |
Re:Re:Reply for Barbara | 14/01/21 19:59:00 | Katrina Black |
Reply | 15/01/21 09:49:00 | Carl Broadley |
Re:Hammersmith Bridge | 15/01/21 10:04:00 | Barbara Stevens |
Re:Re:Hammersmith Bridge | 15/01/21 15:55:00 | Philippa Bond |
Re:Re:Re:Hammersmith Bridge | 15/01/21 23:05:00 | Patrick Barrs |
Re:Re:Re:Re:Hammersmith Bridge | 15/01/21 23:32:00 | Ed Robinson |
Re:Hammersmith Bridge (Too many RE's!) | 16/01/21 00:13:00 | Thomas Jones |
Re:Re:Hammersmith Bridge (Too many RE's!) | 16/01/21 00:23:00 | Ed Robinson |
Re:Hammersmith Bridge | 17/01/21 21:35:00 | Ed Robinson |
Re:Re:Hammersmith Bridge | 20/01/21 14:22:00 | Richard Carter |
Re:Re:Re:Hammersmith Bridge | 20/01/21 18:37:00 | Ed Robinson |
Reply | 20/01/21 22:25:00 | Michael Ixer |
Re:Reply | 20/01/21 23:57:00 | Ed Robinson |
Reply | 21/01/21 00:12:00 | Michael Ixer |