Posted by: Richard Carter
Date/Time: 20/04/25 13:13:00

"£48m worth of reinforcement for cyclists and pedestrians traffic is a scandal and robbery."

It would have been if that was the case, but it wasn't: the work to prepare the bridge for pedestrians and cyclists, as I pointed out, was £2.9 million; the remainder of the £48 million, £45 million, was to restore and keep the bridge safe, which would have been needed even if it hadn't been made ready for pedestrians etc.

And the restoration of Albert Bridge cost £7.2 million (https://citydays.com/places/albert-bridge/), somewhat less than the £250 million (and counting) that would be needed for Hammersmith!


Entire Thread
TopicDate PostedPosted By
Hammersmith Bridge18/04/25 09:10:00 Barbara Stevens
   Re:Hammersmith Bridge18/04/25 09:19:00 Richard Carter
      Re:Re:Hammersmith Bridge18/04/25 09:37:00 Ivonne Holliday
         Re:Re:Re:Hammersmith Bridge18/04/25 13:44:00 Richard Carter
   Re:Hammersmith Bridge18/04/25 09:35:00 Andy Pike
      Reply18/04/25 15:10:00 Richard Carter
         Reply19/04/25 13:27:00 Ivonne Holliday
            Re:Reply19/04/25 14:52:00 Philippa Bond
               Re:Re:Reply19/04/25 16:54:00 Ed Robinson
            Re:Reply19/04/25 21:34:00 Richard Carter
               Re:Re:Reply19/04/25 21:48:00 Ivonne Holliday
                  Re:Re:Re:Reply20/04/25 08:39:00 Richard Carter
                     Re:Re:Re:Re:Reply20/04/25 10:41:00 Ed Robinson
                     Re:Re:Re:Re:Reply20/04/25 12:05:00 Ivonne Holliday
                        Re:Re:Re:Re:Re:Reply20/04/25 13:13:00 Richard Carter
                           Re:Re:Re:Re:Re:Re:Reply20/04/25 14:46:00 Ivonne Holliday

Forum Home