Forum Message

Topic: Re:Re:Reply
Posted by: Ed Robinson
Date/Time: 19/04/25 16:54:00

After all these years of being repaired it looks a complete mess.

Many features are now completely enclosed. Possibly hiding the high energy cooling and heating system needed to stabilise the structure.

One wonders also how much iron has been replaced with steel or other non period materials??

Even after repairs are completed it will probably not come with any guarantee that it will not simply close again a few months later for yet more repairs.

There needs to be greater transparency and accountability for the large sums of public money being spent.

Unfortunately as with other areas of UK life - extreme political ideology is driving policy.



Entire Thread
TopicDate PostedPosted By
Hammersmith Bridge18/04/25 09:10:00 Barbara Stevens
   Re:Hammersmith Bridge18/04/25 09:19:00 Richard Carter
      Re:Re:Hammersmith Bridge18/04/25 09:37:00 Ivonne Holliday
         Re:Re:Re:Hammersmith Bridge18/04/25 13:44:00 Richard Carter
   Re:Hammersmith Bridge18/04/25 09:35:00 Andy Pike
      Reply18/04/25 15:10:00 Richard Carter
         Reply19/04/25 13:27:00 Ivonne Holliday
            Re:Reply19/04/25 14:52:00 Philippa Bond
               Re:Re:Reply19/04/25 16:54:00 Ed Robinson
            Re:Reply19/04/25 21:34:00 Richard Carter
               Re:Re:Reply19/04/25 21:48:00 Ivonne Holliday
                  Re:Re:Re:Reply20/04/25 08:39:00 Richard Carter
                     Re:Re:Re:Re:Reply20/04/25 10:41:00 Ed Robinson
                     Re:Re:Re:Re:Reply20/04/25 12:05:00 Ivonne Holliday
                        Re:Re:Re:Re:Re:Reply20/04/25 13:13:00 Richard Carter
                           Re:Re:Re:Re:Re:Re:Reply20/04/25 14:46:00 Ivonne Holliday

Forum Home