Topic: | Re:Re:Re:Re:Re:Hammersmith Bridge won't be fully open until 2026 | |
Posted by: | Barbara Stevens | |
Date/Time: | 29/10/20 20:53:00 |
The Environment Agency will be loosing out on a lot of money, as boaters will not be renewing their licence for going up River, and a lot of the Locks are being worked on. |