I have been advised that as of Sunday 10 July temporary three-way/two phase traffic signals will be introduced on the Upper Richmond Road junction with West Hill. The temporary signals will be removed by Sunday 7 August and the Upper Richmond Road restrictions in general lifted by early September. The phase was originally planned to take place furing the school summer holidays but has been brought forward to avoid conflict with the London to Surrey Cycle Classic. Serious disruption to vehicular traffic is anticipated during this period. However TfL's rather grandly named London Streets Traffic Control Centre has undertaken to monitor the location closely and to introduce variations to the traffic management dscheme locally if need be. Cllr Leslie McDonnell East Putney Ward |