Topic: | Reply | |
Posted by: | Sean Hodges | |
Date/Time: | 08/09/20 12:03:00 |
I've been visiting Germany for years and I've seen how they manage bridge-building along the Mosel River. At Bernkastel-Kues a few years back, they constructed a replacement bridge beside the existing one. When it was ready they slid the old one onto a barge and slid the new one into place over a weekend. Very impressive engineering and minimal disruption |